Operations is about delivering what the company promises, reliably, at the right cost. Whether it's a quick-commerce dark store, a factory, a hospital or a recruitment process, the same ideas apply.

Everything is a process

A process turns inputs into outputs through steps. To manage one:

  1. Map it: a flowchart or SIPOC (Suppliers, Inputs, Process, Outputs, Customers).
  2. Measure it: volume, time, cost, quality at each step.
  3. Find the bottleneck: the step with the least capacity limits the whole process (theory of constraints). Improving any other step doesn't increase output.
  4. Improve and standardise: fix the bottleneck, then document the new standard operating procedure (SOP).
  5. Control: monitor with dashboards and alerts.

Capacity and utilisation

  • Capacity: the maximum output per period (orders packed per hour).
  • Utilisation = actual output ÷ capacity. Running at 100% leaves no buffer for variability, so queues explode; 80–85% is often healthier.
  • Throughput: actual rate of output. Cycle time: time per unit at a step. Lead time: total time from request to delivery.
  • Little's Law: work in progress = throughput × lead time. To cut lead time, reduce the work waiting in the system.

Metrics operations teams live by

AreaMetrics
Deliveryon-time delivery %, OTIF (on time, in full), average delivery time
Qualitydefect rate, return rate, first-pass yield, complaints
Costcost per order, cost per unit, logistics cost as % of revenue
Inventoryinventory turnover, days of inventory, stockout rate, fill rate
Peopleproductivity per hour, attrition, absenteeism
CustomerCSAT, NPS, SLA compliance

Daily operations habits

Morning reviews of yesterday's numbers, a clear owner for every issue, root-cause analysis instead of firefighting the same problem daily, and communication across teams (sales, finance, warehouse, customer support).

Check yourself

  • A packing line has three steps taking 2, 5 and 3 minutes per order. What's the bottleneck and the maximum output per hour?
  • Why is 100% utilisation dangerous?
  • Explain OTIF to a new joiner.